Web25 jan. 2024 · Making Tween wash solution for a post-run wash, maintenance wash, or standby wash Volume testing According to the system guide, you can use deionized water to thaw reagent cartridges, but as a general rule of thumb you’ll want to stick to lab-grade water for everything else. WebFigure 1: MiSeq System —The compact MiSeq System is well suited for rapid, cost-effective next-generation sequencing. Figure 2: MiSeq System workflow—The streamlined workflow of the MiSeq System enables rapid turnaround time for next-generation benchtop sequencing. Libraries can be prepared with any compatible library preparation kit.
Performing a Post-Run Wash. illumina MiSeq System Manualzz
WebPerforming a Post-Run Wash. illumina MiSeq System Performing a Post-Run Wash Always perform an instrument wash after completing a sequencing run. Follow the software prompts to load the wash components and perform the wash. The post-run wash takes approximately 20 minutes. Webb Add 350 ml wash solution to the 500 ml wash bottle. 4 Insert the MiSeq tube containing 0.01% NaOCl wash solution into position 17 of the wash tray until the neck of the tube is flush with the tray. The tube displaces the Tween. 20 and laboratory-grade water wash solution from position 17. Figure 19 MiSeq Tube in Position 17 of the Wash Tray ... ibm bow valley
Miseq Fgx Instrument Reference Guide Support
WebIdeally, the maintenance wash should be performed just before a sequencing run is loaded. 2.2 If a maintenance wash has not been performed in less than 7 days, refer to QC 570 MiSeq/MiSeq FGx Instrument Washes document to perform a maintenance wash. 2.3 If using LIMS, import your sample sheet into the test batch. 2.4 Retrieve the library pool for … Webイルミナ株式会社 遺伝研究をサポートするシーケンスとマイクロアレイテクノロジー Web10 apr. 2024 · How do you clean MiSeq flow cells? Make sure a flow cell is loaded on the … ibm bpm installation